Demo helper GRI Engine · Native results and factor library wireframes (spec iii) Page 6 of 12 · Activity data and evidence Invented data · Bluefin Foods Group (fictional tenant)
Reporting Cycles / FY2025 GRI report / Activity data

Activity data

What was entered for this cycle, and what backs each entry
Annotation · placementEntry and editing controls belong to the intake surfaces (spec iv); this page is the review view. Spec iii 7.4 defines it read-only, which is how it is drawn
FY2025 GRI report·Jan 2025 to Dec 2025Active These figures were computed on 4 Mar 2026 at 10:12 and reflect every entry as of that moment.
Search entries All organizations All periods All activity types
1 more item is pending outside this list: a certificate on the instruments page
Organization Period Activity type Fuel or carrier Quantity Unit Evidence Entered by
Bluefin Foods Group
HQ backup genset
Jan 2025 Stationary combustion Diesel 850.000 litres Evidence attached Priya Nair
Bluefin Foods Group Feb 2025 Purchased electricity Grid electricity 42,310.000 kWh Evidence attached Priya Nair
Jurong Plant Jan 2025 Stationary combustion Natural gas 18,450.000 m³ Evidence attached Daniel Ong
Jurong Plant Feb 2025 Mobile combustion Diesel 1,240.000 litres Stated basis Daniel Ong
Jurong Plant Mar 2025 Purchased electricity Grid electricity 88,340.000 kWh Evidence attached Priya Nair
Tuas Cold Storage Jan 2025 Purchased electricity Grid electricity 96,220.000 kWh Evidence attached Daniel Ong
Tuas Cold Storage Mar 2025 Refrigerant leakage R-134a
Leakage method: refrigerant topped up at service
12.400 kg Stated basis Daniel Ong
Bangkok Plant
Variant worldthe entry the coverage-gap drawings (pages 03 and 04) point at; not counted in the 48 main-world entries
Feb 2025 Purchased district cooling District cooling 28,400.000 kWh Evidence attached Daniel Ong
Bangkok Plant Mar 2025 Stationary combustion Diesel
Computes with the SG diesel factor · a disclosed stand-in
2,105.000 litres Evidence pending Daniel Ong
Bangkok Plant Apr 2025 Purchased electricity Grid electricity 71,880.000 kWh Stated basis Daniel Ong
Showing 9 of 48 entriespagination not drawn in this setPreviousNext
34 of 52 entries have evidence or a stated basis. Entries without evidence are still included in calculations.
Help hidden (2)
Annotation · not proposed UIThe collapsed help holds plain-language notes on evidence, stated basis, and the leakage method.
Second drawing · the Evidence pending filter turned on · same view, filtered worklist
This filter lists the cycle's pending activity entries; the one pending item elsewhere is linked below.
1 more item is pending outside this list: a certificate on the instruments page
Variant worldthe refused entry the results pages link to (Bangkok Plant · purchased district cooling · Feb 2025) is drawn in the all-entries table above
Organization Period Activity type Fuel or carrier Evidence Entered by Action
Bangkok Plant Mar 2025 Stationary combustion Diesel Evidence pending Daniel Ong Attach evidence
Tuas Cold Storage Feb 2025 Refrigerant leakage R-410A Evidence pending Daniel Ong Attach evidence
Jurong Plant May 2025 Mobile combustion Diesel Evidence pending Daniel Ong Attach evidence
Bluefin Foods Group Jun 2025 Purchased electricity Grid electricity Evidence pending Priya Nair Attach evidence
Showing 4 of 17 pending activity entriespagination not drawn in this setPreviousNext
1 more pending item: the certificate on the instruments page.
Annotation · not proposed UISpec iii 7.4 · the read-only activity data view. Columns are the delivery contract drawn above: organization, period, activity type, fuel or carrier, quantity, unit, evidence state, entered by. The evidence chips and the pending worklist copy are served under content ID engine.evidence.pending; content IDs are cited in annotations only, by design position for this set.
Annotation · not proposed UISpec iii 9.5 and the PM's evidence ruling. Nothing is ever blocked for missing proof: entries without evidence still compute, and the attached-or-stated mix is disclosed in the methodology text instead. The PM's recorded wording for this rule is "This is not an exam"; that phrase stays in annotations and never appears in UI copy. The pending chip is therefore a neutral product-styled chip, not a warning: it marks work remaining, not a violation.
Annotation · not proposed UIHow the counts reconcile. The evidence population of this cycle is 52 items: 48 activity entries, 1 denominator fact, 3 instruments. 34 carry evidence or a stated basis and 18 are pending: 17 activity entries plus 1 instrument document (the TH wind REC). The filter pill counts the 17 pending activity entries this view can list; the muted line under the filter row names and links the one pending item outside it. The denominator fact has its evidence attached.
Annotation · not proposed UIScope boundary. Entry, editing, and bulk intake forms are spec iv scope (the intake workstream) and are deliberately absent here. This page proposes only the read: what exists, what backs it, and where the pending work is.