Demo helper GRI Catalog Admin · Admin wireframes (spec ii) Page 2 of 12 · Edition set preview (resolved) Invented data · Bluefin Foods Group (fictional tenant)

New reporting cycle

Bluefin Foods Group · last step. Check the cycle, check the edition set it will be built from, then activate. Saving the draft and activating are separate actions.
1
Basics
Framework and period
2
Scope
Organizations in scope
3
Methodology lock
GWP, approach, conventions
4
Review and activate
Verify and activate
CycleFY2026 GRI reportlabel: FY2026 (Jul 2025 - Jun 2026) · GRI (native) [draft]
FrameworkGRI (native)
Reporting periodJul 2025 to Jun 2026
Intended publication date30 Nov 2026the date you will publish this report; it decides the edition set below
Organizations in scopeAll organizations14 sites across Singapore, Thailand, and Malaysia
Methodology lockRecorded, provisionalAR6 · operational control · GCV
Statusdraft
Prepared byMei TanSustainability Admin
Edition set
The standard editions this report will be built from, worked out from 30 Nov 2026
resolved
5editions
53disclosures
214clauses to answer
0disclosures excluded
EditionCoversIn force for publicationsDisclosuresClausesExcluded here
GRI 2 2021 edition Organization and reporting practices From 1 Jan 2023 onward. No newer edition is scheduled. 30118None
GRI 3 2021 edition Selecting and managing the topics that matter From 1 Jan 2023 onward. No newer edition is scheduled. 39None
GRI 302 2016 edition Energy use and energy intensity From 1 Jul 2018 onward. A newer edition is required for reports published on or after 1 Jan 2027. 521None
GRI 305 2016 edition Greenhouse gas emissions and other air releases From 1 Jul 2018 onward. A newer edition replaces most of this one for reports published on or after 1 Jan 2027; two of its disclosures carry on after that date. 734Nonefrom 1 Jan 2027: 305-1 to 305-5
GRI 101 2024 editionadded by this date Biodiversity impacts and dependencies From 1 Jan 2026 onward. Included because 30 Nov 2026 falls on or after that date. 832None
This edition set is fixed by your intended publication date, and it locks when the cycle is activated. After activation it does not change. Locking is what keeps the report consistent. Every answer your team enters is written against the same editions from the first entry to the final export, the way a published report names the editions it was prepared under. Editions published after you activate cannot move the ground under a report that is already in progress. While the cycle is still a draft nothing is committed. Change the intended publication date and the edition set is simply worked out again from the new date. If the date turns out to be wrong after the cycle is active, you archive that cycle and create a new one for the date you will really publish on. Nothing your team has entered is silently rewritten. Why does the edition set lock? guidance layer (placeholder)

Want to use a newer edition before the date it becomes required? That is a separate, recorded decision: Adopt a newer edition early. Draft cycles only.

Annotation · not proposed UISpec ii 6.1, binding at activation. While the cycle is a draft this edition set is computed on demand for the preview and is NOT stored. At activation, inside the cycle critical section, the edition set is resolved once more, the content hash of every member edition is verified, and the resolved edition set plus the entitlement state at that moment persist onto the cycle atomically with the status change. From then on every native surface reads the frozen edition set. Internal names for the reviewer: the resolved edition set is an assembly, the cycle field is catalogAssemblyId, and the identity string is assemblyKey. None of those words appear on a screen.
The lock wording, rewritten · the PM's part 1 review, ruling R2-2What changed and why. The earlier lockline ended on "never changes afterwards", which the PM read as a commitment an admin may not be ready to take and which would send them to support before they activate anything. The wording now carries the same behavior with the reason attached: the edition set is fixed by the intended publication date, it locks at activation, and locking is what lets every answer be written against one set of editions from first entry to export. Nothing was softened. The draft-stage escape ("change the date and the edition set is worked out again") and the post-activation recourse ("archive the cycle and create a new one; nothing entered is rewritten") were both already true in spec ii 6.1 and are now on the screen instead of only in the spec. The "Why does the edition set lock?" link is a PLACEHOLDER, not a drawn feature. It marks the point where the guidance layer lands: the PM decided on 2026-08-24 that runtime AI plus deterministic guidance ships in I1, so this is the first anchor for it in this wireframe set. What the link opens, how the guidance is composed, and how AI-written text is labeled are the guidance workstream's to settle, not this drawing's.
Back
Cancel Save as draft Activate cycle