Demo helper GRI Reporting Cycles · Admin wireframes · Option A Page 4 of 12 · Wizard 1 · Basics Invented data · Bluefin Foods Group (fictional tenant)

New reporting cycle

Follow the steps below to create a reporting cycle for Bluefin Foods Group. Creation produces a draft; activation is a separate action on the final step.
1
Basics
Framework and period
2
Scope
Organizations in scope
3
Methodology lock
GWP, approach, conventions
4
Review and activate
Verify and activate
GRI-NG-2026

Validated against the framework registry and the tenant entitlement set. Legacy GRI generation codes are not offered for new cycles.

Annotation · not proposed UIGRI-NG-2026 is a stand-in. The real GRI new-generation registry code is spec ii's deliverable; until it exists, native cycles are created only in non-production environments against a test-registry entry (spec 6.3).
Annotation · not proposed UIPM ruling 2026-08-23: the engine is an internal attribute fixed by framework, never user-facing. GRI cycles run on the native engine only; existing frameworks stay on their current path; there is no user choice.
January
2029

Range 1980 to current year plus 10 (2036)

December
2029

12 months is the interface default and stays editable; any duration is legal subject to the start-year invariant (interface default, not a server rule). Month precision only; all month math is UTC.

Label preview · built from persisted fields only (spec 6.1)
2029 (Jan 2029 - Dec 2029) · GRI-NG-2026 [draft]

Framework code appended after a middle dot. The [draft] suffix drops on activation; [archived], [superseded], and [backfilled] append in that order when they apply.

Annotation · not proposed UIStep order drawn per spec: Basics, Scope, Methodology lock, Review and activate. The shipped Reporting Boundary wizard orders Year first (Year, Framework, Organizations, Review). The spec order stands as drawn per the PM's review completion, 2026-08-23.
Back disabled on the first step
Cancel Save as draft Continue to Scope