Demo helper GRI Catalog Admin · Admin wireframes (spec ii) Page 8b · supplement · Intro overlay pattern Invented data · Bluefin Foods Group (fictional tenant)
Demo helper · what this supplement drawsDrawing 1, below: the Stakeholder groups page exactly as page 08 of this wireframe set draws it, dimmed, with the final first-visit intro overlay open over it in state 1. Drawings 2 and 3, in the amber gallery further down: state 2 with the report note open, and the page header with the reopen control. Ordered by the PM in his part 2 review of 2026-08-24; redrawn the same day to the blended design he picked after the three-concept decision round.

Stakeholder groups

Bluefin Foods Group · the workspace registry, and what each reporting cycle recorded from it
About this page
Workspace registry
The current list of groups this workspace engages with
New group
GroupCategoryEngagement modeStatus
Employees and contractors
Group-wide, 2,140 people
workforcesurvey
Annual engagement survey
active
Contract growers
Renamed from Contract farmers on 02 Jun 2026
suppliersmeeting
Grower meetings, three regions
active
Retail customers
SG, TH, MY retail accounts
customerssurvey
Consumer panel and service line
active
Food safety regulators
Three jurisdictions
regulatorswritten-submission
Filings and inspection responses
active
Neighboring communities
Johor and Rayong plant catchments
communitiesgrievance-channel
Community liaison meetings
active
Regional wholesalers panel
2024 pilot, no longer convened
customersmeetinginactive
Deactivated 04 Jan 2026
Groups are deactivated, never deleted, so every snapshot and every later consultation record still resolves to the group it was written against. An empty registry is valid: nothing in the reporting flow waits on the stakeholder group registry.
Cycle snapshots · FY2025 GRI report
Jan 2025 to Dec 2025 · active · what this cycle recorded, version by version
Refresh snapshot
Refresh takes a new version. It never edits or replaces an existing one. This cycle is active and its methodology lock is provisional, so the latest version can still be refreshed: pressing Refresh snapshot records the registry as it stands today as version 3, and versions 1 and 2 stay exactly as they were taken.
Version 2 latest can be refreshed View recorded groups
Taken15 Jun 2026, 09:24 UTCrefreshed while the cycle was active
Taken byPriya NairSustainability Admin
Groups recorded5
Version 1 superseded by version 2 View recorded groups
Taken12 May 2026, 06:11 UTCtaken when the cycle was activated
Taken byMei TanSustainability Admin
Groups recorded5
Keep today's list. Preserve what each report saw.
A short welcome for your first visits · the page works the same without it
One list of everyone Bluefin Foods Group listens to, and a dated copy of that list kept for every GRI report.
The page below, in miniature
Workspace registryNew group
Employees and contractorsactive
Contract growersactive
The living list: employees, growers, communities, regulators, customers. Add a group here, or rename and deactivate one from its row menu.
Cycle activated
Snapshot taken
Cycle snapshotsRefresh snapshot
Version 2latestcan be refreshed
Version 1superseded
The record your report cites: who was engaged at the time, kept exactly as recorded even if a group changes later.
Most weeks there is nothing to do here. You would drop in when: a reporting cycle is being set up the company starts engaging a group a group is renamed or retired An empty registry never blocks a cycle.
How this shows up in the finished report
Do not show this when I visit this page This introduction stops appearing by itself after your third visit. Bring it back any time from About this page, in the page header.
Got it
Annotation · the decision behind this drawingBlended on the PM's pick of 2026-08-24. The first drawing of this overlay, four paragraphs of prose at about 210 words, was rejected for its presentation in the PM's part 2 review. Three designers then proposed replacements blind against the same bundle, and the PM picked the page-in-miniature concept, the workspace designer's, as the base, with the best pieces of the competing two blended in. From the competing Codex concept: the headline ("Keep today's list. Preserve what each report saw.") and the two stacked connector labels ("Cycle activated", "Snapshot taken"), which replace the miniature's own nine-word arrow label that wrapped badly. The moments line already carried the competing Grok concept's permission-first move ("Most weeks there is nothing to do here"). Everything else on this card is the miniature concept as written. The rejected drawing is preserved as a copy beside the exhibit, and the full round history lives in the decision exhibit.
Annotation · where this page comes from, and what it isOne overlay pattern, drawn once. This supplement was ordered by the PM in his part 2 wireframe review of 2026-08-24, after this round closed. It draws the first-entry introduction ONCE, on the Stakeholder groups surface, as the pattern: the same overlay, each with its own authored content, appears on first entry to Value Chain and to Frameworks and Access. One authored content record per page, three records total; nothing about the overlay's frame, mechanics, or dismissal varies between the three. No spec ii section covers this surface, because it postdates the spec; the mechanics stated in these annotations are the proposal that a spec addition has to pin down before any build.
Annotation · replica fidelity, and one consequenceThe miniature is replica UI, warn-toned chips included. The two small panels inside the dialog reuse the page's exact panel titles, button styling, and chip colors, so the miniature visibly rhymes with the dimmed panels behind the glass, and the page already looks familiar when the overlay closes. That is why the dialog carries the page's warn-toned "can be refreshed" and "superseded" chips: they are copied page UI, not annotation scaffolding, and the PM decided replica fidelity stays. The cost, recorded in the round: the replica couples this overlay to the page 08 drawing, so a change to that page means redrawing the miniature.
Annotation · content provenanceAuthored guidance, no AI label. The introduction text is authored, versioned, human-reviewed guidance content. It carries no AI-generated label, per the PM's provenance ruling of 2026-08-24: a model may draft guidance text, but a human reviews, edits, and owns what ships, so what the user reads is the product speaking. The overlay therefore has no AI badge, no regenerate control, and no model attribution anywhere.
Annotation · where the state livesPer user, server-side. The showing count and the do-not-show choice persist per user on the server, as a small addition to user settings; never in browser storage. A user who signs in from a second machine, clears a browser, or works at a shared terminal must not be greeted as brand new, and an introduction that resurfaces after every cache clear would train people to ignore guidance. Per user, not per workspace: Mei Tan dismissing the introduction hides nothing from Priya Nair. Counting proposal: a showing is counted each time the overlay opens on page entry, however it is then closed; after the third counted showing it no longer opens by itself.
Annotation · failure postureNever on the critical path. The Stakeholder groups page renders and works identically with the introduction dismissed, exhausted, toggled off, or its content record missing entirely. A missing or failing content record means no overlay and no error, never a blocked page. Nothing in the reporting flow reads or waits on introduction state.
Annotation · copy ownershipThe words above are placeholders. The overlay copy on this page is placeholder authoring, written to show shape, length, and tone: a gentle wave, not a tsunami, with no literal topic headings. The guidance workstream owns the final copy for all three introductions, and that work starts only on the PM's GO.